Journal Forum

Synchronized Swept-Sine: Theory, Application, and Implementation - October 2015

Effect of Microphone Number and Positioning on the Average of Frequency Responses in Cinema Calibration - October 2015
1 comment

The Measurement and Calibration of Sound Reproducing Systems - July 2015

Access Journal Forum

AES E-Library

Sound Amplification Systems for San Diego All American Stadium

Document Thumbnail

The San Diego All American Stadium, located in the Mission Valley, eight miles from downtown San Diego, is the most recently completed outdoor stadium in the West. The Architect began preliminary design in June 1965 and construction was completed in August 1967, at a total cost of about $28,000,000. The stadium is principally used for professional and college football games, and major league baseball, with occasional large civic events or performances by visiting shows.

AES Convention: Paper Number:
Publication Date:

Click to purchase paper or login as an AES member. If your company or school subscribes to the E-Library then switch to the institutional version. If you are not an AES member and would like to subscribe to the E-Library then Join the AES!

This paper costs $20 for non-members, $5 for AES members and is free for E-Library subscribers.

Learn more about the AES E-Library

E-Library Location:

Start a discussion about this paper!

Facebook   Twitter   LinkedIn   Google+   YouTube   RSS News Feeds  
AES - Audio Engineering Society